Fluidstack
Energy Marshal, Multi-Site
U.S. Remote. Posted 2 months ago
The role
The Energy Marshal will own hazardous energy control across multiple concurrent gigawatt-scale data center builds. This includes managing switching plans, LOTO procedures, and energization sequences from construction through commissioning.
What you will do
- Own hazardous energy control across multiple concurrent gigawatt-scale data center builds.
- Write, review, and approve switching plans, LOTO procedures, energization sequences, and zero-energy verification.
- Run pre-energization and energization kick-off meetings.
- Authorize, pause, or stop any energization, isolation, or restoration.
- Audit the electrical safety program in the field including JHAs, permits, and PPE.
- Create and run the Kirk key program.
- Maintain the tamper seal program on all energized and isolated equipment.
- Manage contract site-level Energy Marshals at every active campus.
- Build the multi-site Energy Marshal standard including templates and training.
Required qualifications
- Minimum of five years as an Energy Marshal or Controlling Energy Marshal on data center or mission-critical construction.
- Have run energizations end to end on more than one site at a time.
- Current NFPA 70E qualified-person training.
- Recognized electrical safety credential (NFPA CESCP or CESW).
- OSHA 30 Construction.
- Current First Aid/CPR/AED.
- Experience writing and approving switching orders and LOTO procedures on MV and LV distribution.
- Experience directing other Energy Marshals or electrical safety leads across more than one site.
- Experience coordinating GC, electrical subcontractor, commissioning agent, utility, and owner operations teams.
- Experience running a Kirk key interlock or tamper seal program.
- Ability to lift, carry, push and pull up to 40 pounds.
- Ability to sit, stand, walk, kneel, bend and crouch for long periods.
Nice to have
- Electrician licensure (journeyman or master)
- Utility safety leadership (CUSP)
- Commissioning credentials (CxA, QCxP)
- Arc flash and coordination study review (SKM, ETAP)
- Behind-the-meter generation and multi-state utility interconnection
About the company
Fluidstack delivers 10 to 100s of GWs of compute by acquiring power, designing and building data centers, and operating them. They are focused on building civilization-scale infrastructure for AI.